Home : Media : ASC In the News : Photos : Shared Media Manager
SharedMediaManager
ImageGallery
Keyword:
Category:
Tag:
Sort By:
The results of the exercise will inform senior leaders the infrastructure requirements to support critical missions on the installation in the event of a power outage.


RIA readies itself for ‘Black Start’ power outage exercise May 16

This island installation will be conducting an Energy Resilience Readiness Exercise dubbed “Black Start” on May 16 to test installation emergency and standby energy generation systems, critical infrastructure and equipment.

Related Imagery
Linda Lambiotte
220512-D-JM046-001.JPG

DOWNLOAD PHOTO
(0.22 MB)



Tags




< Back to Main Gallery